Here is the rock around the dining room columns. These are much more time consuming because it is such a small area. We are still really pleased with how the rock is looking. A sill plate will also go on top of the rock columns too.
I am also in the process of procrastinating on finishing up the texturing and painting. I know I have said it multiple times, but I am hoping by the end of the weekend, we can be done with painting. Travis is hoping to get the columns and the fireplace rocked by next week. We are also putting down more backerboard, so once the rock is up and all the rooms are painted, we can start tiling. We were actually able to get a lot of backerboard put down last night because I accidentally mixed too much thinset and we had to use it all. We now have the kitchen and nook area ready for tile and are working our way down to the garage entry. We also had a water line hooked up to our well the end of last week, but we still don't have water because they haven't put the pressure gauge in yet (I think). So hopefully that happens soon and it is almost time for the septic system to get put in.
No comments:
Post a Comment